Case Study / Production & Fabrication

Special Olympics World Games Abu Dhabi

Higher Committee for Hosting the Special Olympics · 2019

Outdoor Pavilion Design, Fabrication & Installation for one of the world's most celebrated sporting events — delivered on a last-minute timeline against challenging weather conditions.

Special Olympics World Games Abu Dhabi

Event Date

Mar 2019

Pavilion Size

200 sqm

Event Duration

10 Days

Power Interruptions

Zero

Client

Higher Committee for Hosting the Special Olympics

Services

Production & Installation

Location

Abu Dhabi, UAE

Outdoor Pavilion Design, Fabrication & Installation for one of the world's most celebrated sporting events — delivered on a last-minute timeline against challenging weather conditions.

The Challenge

The Special Olympics World Games Abu Dhabi required high-quality branded environments for athletes, delegates and visitors from around the world.

The project was awarded at the last minute, leaving very little time for design, approvals, production and installation. Adding to the complexity, the 200 sqm outdoor pavilion had to be engineered for strong winds while maintaining a compelling visual design.

Key Challenges

  • Strong wind conditions
  • Rain for 3 consecutive days
  • Tight turnaround time
  • Safe & reliable electrical setup

The Solution

Cornerstone managed the project from concept to completion, overseeing every stage of the execution process.

  • Engineered structure for high wind resistance and stability
  • Waterproof roofing and side details to withstand heavy rain
  • Weather-sealed electrical connections with proper insulation to prevent any power failures
  • Fabricated all branding and structural elements with durable materials
  • Coordinated production across multiple suppliers
  • Managed on-site installation and finishing

Close coordination between our design, production and installation teams ensured delivery within the available timeframe.

The Outcome

The pavilion was successfully completed and installed on schedule, providing a functional and visually impactful space throughout the 10-day event.

Despite the challenging weather conditions, including strong winds and rain for 3 days, the pavilion remained safe, operational and visually impressive with zero power interruptions.

The project was delivered without compromising quality, demonstrating Cornerstone's ability to manage complex outdoor production challenges through careful planning, technical expertise and disciplined execution.

The Outcome

The pavilion was successfully completed and installed on schedule, providing a functional and visually impactful space throughout the 10-day event.

Services Delivered

Design & Creatives

Production & Fabrication

On-site Installation

Large Format Printing

Quality Control

Project Management

Built to perform. Whatever the condition.

From tight timelines to challenging environments, we deliver experiences that stand strong.

Project Gallery

Special Olympics World Games Abu Dhabi gallery 1
Special Olympics World Games Abu Dhabi gallery 2

Start your project

Ready to achieve results like these?

Get in Touch
Contact